Project Case Studies

Brownfield control system design – inter-facility shutdown signal interface

Inter-facility Shutdown Signal: Brownfield Control System Design Project

Our client needed a way to alert a third-party facility during an emergency shutdown—without introducing new risks or unnecessary complexity. We delivered a clear, practical design that integrated seamlessly into the existing system, helping the project stay on track and giving the operations team confidence ahead of the shutdown deadline. […]

Read More… from Inter-facility Shutdown Signal: Brownfield Control System Design Project

Read Case Study »